Below listed are our projects and experiences:

PROJECT: Replacement of Existing Abura 9S & 9L Flowlines With 4″ X Sch 80 X 18.0KM IN OML 65
CLIENT: Montego / NPDC
PERIOD: Jan. 2016

Project Scope of Work:
The dual flow-line is 18km long from the well head to the flow-station, running through the existing ROW. The ROW partly land and swampy terrain (about 6.5km swamp).
Fabrication & Installation of wells hook up spools and manifold hook up spools.
Hydro testing, NDT, pre-commission.

Key Milestones:
Over 1600 Joints welded with average weld repair rate 0.02% industry standard accepted repair rate 2%).
310000 Man-hour with ZERO LTI

PROJECT: Assembling of 90 tons Gas Inlet Manifold for ANOH Gas Plant
CLIENT: Montego / AGPC
LOCATION: Port Harcourt.
PERIOD: Dec. 2020 – Jan. 2021

Project Scope of Work:

Provision of manpower equipment & consumables, Erection of structural steel platforms, piping erection, installation of Valves and instrumenet, piping insulation, Bolt torquing, leak testing and paint touch up. and painting

Key Milestones:
9000 Man-hour with ZERO LTI

PROJECT: EPC of Pig Launcher and Receiver at Creek Town
CLIENT: Savannah Energy Limited
LOCATION: Creek Town Facility Calabar.
PERIOD: Feb. 2021 – May. 2021

Project Overview: The project is about the Engineering Procurement and Construction, 28”X24” PIG Launcher and 36”x24” Pig Receiver at creek Town Facility.
The Creek Town facility is an un-manned manifold platform located at 5°00’06.9″N 8°16’20.4″E Creek Town in Calabar. Gas at 60Barg is discharged from the Uquo CPF into the 24” pipeline connecting Oron and extending to Creek Town, where the flow is split to flow into 3 directions.
– 21km gas flow to Calabar NIPP (NDPHC)
– 17km gas flow to City Gate Calabar and
– 90km gas flow to Ukanafun via Uruan and Ibesikpo

Project Scope of Work: Engineering, Fabrication & construction, Civil & structural Construction, Testing and commissioning.

Key Milestones:
Zero Client NCR’s and combined average weld repair rate 0.1% (industry standard accepted repair rate 2%).
9000 Man-hour with ZERO LTI

PROJECT: Fabrication of Mud Skips (500 Units)
CLIENT: Montego Upstream Services Ltd
PERIOD: Jan. 2015 – Oct. 2015

Project Scope of Work:
Design, Procurement of materials, fabrication, blasting and painting, Load testing and certification.
Capacity: 2.3 Cubic meters
Key Milestones:
25000 Man-hour with ZERO LTI
So far

PROJECT: Installation & Commissioning of Uquo Metering Facilities
CLIENT: Seven Energy Nigeria Limited
LOCATION: UQUO CPF EKET.
PERIOD: Dec. 2013 – April. 2015

Project Overview: The project is about the construction, testing and commissioning of the Uquo metering facilities and appurtenances associated with the Oron Gas
Pipeline; a 37.8 km long 24” diameter Oron Gas Pipeline that starts at the Uquo Gas Processing Facility (UGPF) North of Qua Ibo, and ties intothe 24” Calabar – Adanga
Gas Pipeline at Oron. UGPF is an existing gas processing plant.

Project Scope of Work: Civil Construction, Piping, Structural steel, Mechanical, Electrical and Instrumentation (MEI)

Key Milestones:
Preconstruction documentation and mobilization Material procurement; pipes, fittings, structural steel and cables, Shop fabrication of piping and service platforms and testing, Site installation testing and commissioning.

Zero Client NCR’s and combined average weld repair rate 0.1% (industry standard accepted repair rate 2%).
722060 Man-hour with ZERO LTI

PROJECT: New PBK ERECTION & Piiping Fabrication
CLIENT: Notore
LOCATION: Onne – Port Harcourt.
PERIOD: July 2020 – Nov. 2020

Project Scope of Work: Provision of manpower equipment & consumables; Fabrication and Erection of piping & structural steel platforms, Erection of package boiler equipment & accessories, pre-commissioning / commissioning.

Key Milestones:
Over 2000 Dia-inch piping welded with average weld repair rate 0.05% (industry standard accepted repair rate 2%).
18000 Man-hour with ZERO LTI

PROJECT: Emergency Repair Of Niger Bridge
CLIENT: Federal Ministry of works
PERIOD: June. 2014 – April 2015

Project Scope of Work:
Provision of scaffolding services, and blasting and painting of bridge super structures

Key Milestones:
86000 Man-hour with ZERO LTI

PROJECT: Piping Fabrication & Installation, Blasting & Painting At Liquid Bulk Tank Farm
CLIENT: Liquid Bulk Nigerian Limited
LOCATION: Rumuolumeni Port Harcourt.
PERIOD: Aug. 2013 – Nov. 2013

Project Overview:
Laying of 3×10”x500m supply lines from the jetty to the tanks, to convey; AGO, PMS & DPK.
Installation of piping connections from the tanks to the pump house and to the gantry. Installation of fire water piping system.

Project Scope of Work: Provision of manpower equipment & consumables, Fabrication and installation of interconnecting piping, Hydrotesting, blasting and painting

Key Milestones:
Over 3000 Dia-inch piping welded with average weld repair rate 0.05% (industry standard accepted repair rate 2%).
23040 Man-hour with ZERO LTI

PROJECT: Project Management Support Services for Oben Gas Plant Expansion Project
CLIENT: Montego / Seplat
PERIOD: Aug. 2014 – April. 2015

Project Overview: Installation of Installation of a 2X70Mmscf/d gas trains and associate utilities. Sales gas to be processed to West African Gas Pipeline (WAGP) specification and delivered to the nearby NGC Oben manifold that contributes to the Escravos-Lagos Pipeline System (ELPS) and ultimately, West African Gas Pipeline (WAGP).

Project Scope of Work:
Provision of Site supervisors, Fitters, Coded welders, Scaffolders and riggers for piping fabrication, installation and commissioning.

Key Milestones:
Over 13000 Dia-inch piping welded with average weld repair rate 0.1% (industry standard accepted repair rate 2%).
95200 Man-hour with ZERO LTI

PROJECT:   TAM 2020 REHABILITATION OF PRIMARY REFORMER AT NOTORE FERTILIZER PLANT                                                                                                              CLIENT: Notore
LOCATION: OnNe – Port Harcourt.
PERIOD: Feb. 2021 –

Project Scope of Work: Provision of personnel; Pipe Fitters, High Pressure Pipe Welder, Riggers, Scaffoldres, mechanical fitters, sturctural welders, supervisors, QHSE & general labour.
Provision of equipment and tools for fabrication and erection works,

Key Milestones:
Over 150 man/day operation being

Recent Projects

  • Installation And Commissioning Of Uquo Metering Facilities – Seven Energy Nigeria Limited
  • Fabrication of 8”X4 Headers (1500#) Inlet Manifold – Montego / Seplat
  • Blasting and Painting of Piping at Liquid Bulk Tank Farm – Liquid Bulk Nigeria Ltd
  • Replacement of Existing Abura 9S&L Flowlines with 4″ X Sch 80 X 8.0KM in OML 65 – Montego / NPDC
  • Project Management Services for Oben Gas Plant Expansion Project – Montego/DBN/SEPLAT
  • Relocation of Motor Operated Valves at Uquo Metering Facility – Fortune Engineering / Seven Energy
  • Emergency Repair of Niger Bridge (Blasting & Painting of Bridge Structures) – Federal Ministry of Works
  • Piping Tie-In for Packaged Boiler (PBK-2008U) (Shut Down Program) – Notore Chemical Industries Plc.
  • Installation of Flexible Connections on The Export Suction Lines – Universal Energy Resources Limited
  • Fabrication and Installation of 6” Check Valve on Stubb Creek Gas Pipeline at UQUO CPF – Universal Energy Resources Limited
  • Fabrication 500 Units 2.3 Cubic Meters Capacity Mud Skips – Montego Upstream Services Ltd
  • Design, procurement, Fabrication and Installation of TDU & Waste containment ware houses for Montego Thermal Distortion Unit Facility Development – Montego Upstream Services Ltd
  • Supply of Piping Material For Ovorh Gas Lift Project – Montego / Seplat
  • Supply of Steel Plates For Pressure Vessel Construction – Montego / Seplat
how can we help you?

Contact us at the Afrizone Technical Limited office nearest to you or submit a business inquiry online.